Project management

Paper instructions:
 The assignment should contain a minimum of 2500 and a maximum of 3000 words. The word count relates only to sections a, b and c of assignment parts 1-7 and DOES NOT include cover page, Key Learning Points, individual contribution descriptions, or any appendices.

Required to submit a detailed written report on the “Replicated Panels for a Flight Simulator: A Case of Project Management” case study. –> *REFER TO ATTACHMENT*

Case Synopsis:
Designed to encourage thought and debate about the nature of project management and, in particular, the challenges of executing a project within a small organisation.
• Review the case “Replicated Panels for a Flight Simulator: A Case of Project Management” (611-018-1)
• Complete the assignment described on page 12 in Section 3 of the case study handout.

Guidelines for assignment 2: *Refer to Attached; “Assignment Preparation”*
Marking scheme
1. Project Charter
a. Purpose 1 MARK
b. Benefits 1 MARK
c. Comments on how it was deployed in this project 2 MARKS
d. Completed example fitted to 1 or 2 A4 pages – must be legible 12 MARKS

2. Work Breakdown Structure (WBS)
a. Purpose 1 MARK
b. Benefits 1 MARK
c. Comments on how it was deployed in this project 2 MARKS
d. Completed example fitted to 1 or 2 A4 pages – must be legible 12 MARKS

3. Organisational Breakdown Structure (OBS)
a. Purpose 1 MARK
b. Benefits 1 MARK
c. Comments on how it was deployed in this project 2 MARKS
d. Completed example fitted to 1 or 2 A4 pages – must be legible 8 MARKS

4. Responsibility Assignment Matrix (RAM)
a. Purpose 1 MARK
b. Benefits 1 MARK
c. Comments on how it was deployed in this project 2 MARKS
d. Completed example fitted to 1 or 2 A4 pages – must be legible 8 MARKS

5. Gantt Chart
a. Purpose 1 MARK
b. Benefits 1 MARK
c. Comments on how it was deployed in this project 2 MARKS
d. Completed example fitted to 1 or 2 A4 pages – must be legible 12 MARKS

6. Cost Breakdown Structure (CBS)
a. Purpose 1 MARK
b. Benefits 1 MARK
c. Comments on how it was deployed in this project 2 MARKS
d. Completed example fitted to 1 or 2 A4 pages – must be legible 10 MARKS

7. A temporal representation of the project costs – marks
a. Purpose 1 MARK
b. Benefits 1 MARK
c. Comments on how it was deployed in this project 2 MARKS
d. Completed example fitted to 1 or 2 A4 pages – must be legible 10 MARKS

Get a 10% discount on an order above $50
Use the following coupon code :DUE